{"id":38817,"date":"2026-10-01T02:53:14","date_gmt":"2026-10-01T10:53:14","guid":{"rendered":"https:\/\/www.linquip.com\/blog\/?p=38817"},"modified":"2026-10-01T02:53:14","modified_gmt":"2026-10-01T10:53:14","slug":"common-wall-formwork-challenges-and-how-to-avoid-them","status":"publish","type":"post","link":"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/","title":{"rendered":"Common Wall Formwork Challenges and How to Avoid Them"},"content":{"rendered":"<div id=\"ez-toc-container\" class=\"ez-toc-v2_0_88 counter-hierarchy ez-toc-counter ez-toc-grey ez-toc-container-direction\">\n<div class=\"ez-toc-title-container\">\n<p class=\"ez-toc-title\" style=\"cursor:inherit\">Table of Contents<\/p>\n<span class=\"ez-toc-title-toggle\"><a href=\"#\" class=\"ez-toc-pull-right ez-toc-btn ez-toc-btn-xs ez-toc-btn-default ez-toc-toggle\" aria-label=\"Toggle Table of Content\"><span class=\"ez-toc-js-icon-con\"><span class=\"\"><span class=\"eztoc-hide\" style=\"display:none;\">Toggle<\/span><span class=\"ez-toc-icon-toggle-span\"><svg style=\"fill: #999;color:#999\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" class=\"list-377408\" width=\"20px\" height=\"20px\" viewBox=\"0 0 24 24\" fill=\"none\"><path d=\"M6 6H4v2h2V6zm14 0H8v2h12V6zM4 11h2v2H4v-2zm16 0H8v2h12v-2zM4 16h2v2H4v-2zm16 0H8v2h12v-2z\" fill=\"currentColor\"><\/path><\/svg><svg style=\"fill: #999;color:#999\" class=\"arrow-unsorted-368013\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"10px\" height=\"10px\" viewBox=\"0 0 24 24\" version=\"1.2\" baseProfile=\"tiny\"><path d=\"M18.2 9.3l-6.2-6.3-6.2 6.3c-.2.2-.3.4-.3.7s.1.5.3.7c.2.2.4.3.7.3h11c.3 0 .5-.1.7-.3.2-.2.3-.5.3-.7s-.1-.5-.3-.7zM5.8 14.7l6.2 6.3 6.2-6.3c.2-.2.3-.5.3-.7s-.1-.5-.3-.7c-.2-.2-.4-.3-.7-.3h-11c-.3 0-.5.1-.7.3-.2.2-.3.5-.3.7s.1.5.3.7z\"\/><\/svg><\/span><\/span><\/span><\/a><\/span><\/div>\n<nav><ul class='ez-toc-list ez-toc-list-level-1 ' ><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-1\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#Poor_Set-Out_and_Alignment\" >Poor Set-Out and Alignment<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-2\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#Weak_Bracing_and_Formwork_Movement\" >Weak Bracing and Formwork Movement<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-3\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#Concrete_Leakage_at_Joints\" >Concrete Leakage at Joints<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-4\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#Inadequate_Reinforcement_Cover\" >Inadequate Reinforcement Cover<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-5\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#Poor_Concrete_Placement_and_Compaction\" >Poor Concrete Placement and Compaction<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-6\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#Surface_Defects_and_Honeycombing\" >Surface Defects and Honeycombing<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-7\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#Unplanned_Openings_and_Service_Penetrations\" >Unplanned Openings and Service Penetrations<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-8\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#Unsafe_Work_Practices_During_Formwork_Installation\" >Unsafe Work Practices During Formwork Installation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-9\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#A_Practical_Pre-Pour_Check\" >A Practical Pre-Pour Check<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-10\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#Build_Better_Walls_Through_Better_Preparation\" >Build Better Walls Through Better Preparation<\/a><\/li><li class='ez-toc-page-1 ez-toc-heading-level-2'><a class=\"ez-toc-link ez-toc-heading-11\" href=\"https:\/\/www.linquip.com\/blog\/common-wall-formwork-challenges-and-how-to-avoid-them\/#FAQs\" >FAQs<\/a><\/li><\/ul><\/nav><\/div>\n<h1><\/h1>\n<p><span style=\"font-weight: 400;\">Concrete walls can look straightforward on a drawing, yet site conditions can quickly reveal gaps in planning. A small set-out error, loose brace or poorly sealed joint can affect the wall\u2019s strength, finish and nearby work.<\/span><\/p>\n<p><a href=\"https:\/\/riseproducts.com\/water-resistant-formwork-wall-systems\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">Concrete wall forms<\/span><\/a><span style=\"font-weight: 400;\"> shape and support fresh concrete while it gains strength. Correct installation requires careful preparation, clear responsibilities and checks throughout the pour. This guide covers common issues, early warning signs and practical ways to reduce costly rework.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Poor_Set-Out_and_Alignment\"><\/span><b>Poor Set-Out and Alignment<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Incorrect set-out is one of the most common causes of uneven, out-of-plumb or incorrectly positioned walls. Errors may start with unclear drawings, missed reference points or a rushed layout check before formwork installation begins.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Check the wall location, dimensions, levels and openings against the approved drawings before components are fixed in place. For projects involving vertical structural elements, review suitable solutions for columns, blade walls and lift or stair shafts as part of early planning.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Use reliable survey controls and check alignment more than once. A second check before reinforcement and a final check before concrete placement can identify problems while they are still simple to correct.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Common signs of a set-out issue include:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Wall lines that do not match slab markings<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Openings that are too narrow, wide or off-centre<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Formwork faces that are not plumb<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Inconsistent wall thicknesses<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Misaligned joints between adjoining wall sections<\/span><\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Weak_Bracing_and_Formwork_Movement\"><\/span><b>Weak Bracing and Formwork Movement<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Fresh concrete places pressure on the formwork. If braces, ties, supports or connections are inadequate, the wall can move during placement. This may lead to bulging, leaking joints, poor alignment or a wall that falls outside the required tolerance.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The formwork system needs to suit the wall height, thickness, concrete placement method and pour rate. Where water exposure is part of the project, select<\/span><a href=\"https:\/\/riseproducts.com\/water-resistant-formwork-wall-systems\/\" target=\"_blank\" rel=\"noopener\"> <span style=\"font-weight: 400;\">water-resistant formwork wall systems<\/span><\/a><span style=\"font-weight: 400;\"> that match the wall\u2019s intended use and detailing requirements.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Inspect all supports before the pour starts. Do not assume a system is secure because it looked stable during installation. Concrete pressure increases as the wall fills, so the team must monitor the formwork throughout placement.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Concrete_Leakage_at_Joints\"><\/span><b>Concrete Leakage at Joints<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Concrete slurry can escape through unsealed joints, gaps around penetrations or damaged formwork edges. Even a small leak can create honeycombing, rough surfaces and wasted concrete. Larger leaks can affect the wall shape and create a safety risk for workers nearby.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Prevent leakage by checking every joint, corner, tie location and service penetration before the pour. Use the sealing method approved for the formwork system, and replace damaged components rather than trying to force them into place.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">During concrete placement, appoint a worker to inspect the outside of the formwork. If slurry starts escaping, pause the pour if needed and address the source before it becomes worse. Continuing without a response can turn a minor repair into extensive rectification work.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Inadequate_Reinforcement_Cover\"><\/span><b>Inadequate Reinforcement Cover<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Reinforcement needs the required concrete cover to support long-term durability and protect steel from exposure. Poorly positioned bars, missing spacers or formwork movement can reduce cover and create issues that may not be visible after the wall is complete.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Install reinforcement in line with the approved structural drawings. Use appropriate bar chairs, spacers and ties to keep steel in position while concrete is placed and compacted. Check cover at wall faces, corners, openings and congested areas before closing the forms.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Reinforcement should not be pushed against formwork to make it fit. If there is not enough space for the specified steel and cover, stop and review the detail with the relevant project professional. Changing reinforcement placement without approval can affect the wall\u2019s performance.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Poor_Concrete_Placement_and_Compaction\"><\/span><b>Poor Concrete Placement and Compaction<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Even well-installed <\/span><a href=\"https:\/\/riseproducts.com\/column-blade-walls-and-lift-stair-shafts\/\" target=\"_blank\" rel=\"noopener\"><span style=\"font-weight: 400;\">wall formwork<\/span><\/a><span style=\"font-weight: 400;\"> can produce a poor result if concrete is placed too quickly, dropped from excessive height or compacted inconsistently. These practices can increase pressure on forms, separate the mix or leave voids around reinforcement.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Plan the pour sequence before the truck arrives. Confirm where the pump line will sit, how concrete will be distributed and who will monitor formwork movement. Place concrete in controlled lifts where required by the project method and avoid concentrating too much material in one area.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Compaction also needs care. Insufficient vibration can leave voids, while excessive vibration may cause mix separation or place unnecessary stress on the formwork. Workers should use the specified method and pay close attention around reinforcement, corners and penetrations.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Surface_Defects_and_Honeycombing\"><\/span><b>Surface Defects and Honeycombing<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Honeycombing occurs when coarse aggregate is visible and sections of concrete have not fully filled around reinforcement or against the formwork face. It can affect appearance and may require repair, depending on its depth, location and the wall\u2019s structural role.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Common causes include leaking forms, poorly compacted concrete, congested reinforcement and a mix that is unsuitable for the wall detail. Preventing the issue starts before the pour by checking that concrete can flow through the reinforcement arrangement and reach all parts of the form.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If honeycombing is found after forms are removed or the wall surface is exposed, document the location and extent. Do not cover it with a finish before the appropriate person has reviewed it. Repairs should follow an approved method suited to the defect and wall application.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Unplanned_Openings_and_Service_Penetrations\"><\/span><b>Unplanned Openings and Service Penetrations<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Electrical conduits, plumbing sleeves, fixings and access openings need to be coordinated before concrete placement. Late changes can lead to drilling, cutting or patching after the wall has cured, which may affect the wall finish and require further review.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Prepare a penetration schedule that matches the current drawings. Mark each location on site and confirm the size, depth and purpose of every opening. This is especially useful where several trades need access through the same wall.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Check that penetrations do not clash with reinforcement, ties or structural zones. If a conflict is found, raise it before the pour. A short coordination discussion at this stage can prevent expensive work after the concrete has cured.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"Unsafe_Work_Practices_During_Formwork_Installation\"><\/span><b>Unsafe Work Practices During Formwork Installation<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Wall formwork work can involve lifting, working at height, moving heavy components and operating around wet concrete. Poor access, rushed handling or unclear communication can put workers at risk and damage the installed system.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Prepare the work area before materials arrive. Keep access paths clear, store components on stable ground and use the planned lifting method for heavy or awkward items. Follow site safety procedures, use suitable personal protective equipment and keep unauthorised workers away from the pour area.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Before placing concrete, confirm who has authority to stop the work if movement, leakage or another hazard appears. Clear roles help the crew respond quickly when conditions change.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"A_Practical_Pre-Pour_Check\"><\/span><b>A Practical Pre-Pour Check<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">A pre-pour check gives the team one final chance to confirm that the formwork is ready. It should involve the people responsible for formwork, reinforcement, concrete placement and site supervision.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Walk the wall from end to end rather than checking only the most visible areas. Review the inside and outside faces, corners, openings, supports and access arrangements. Record any issue and resolve it before concrete is placed.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Use this checklist before starting the pour:<\/span><\/p>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Confirm wall location, level, dimensions and plumb<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Check braces, ties, connections and supports<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Inspect joints, corners and penetrations for gaps<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Confirm reinforcement position and required cover<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Check openings, sleeves and embedded items<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Confirm concrete placement method and pour sequence<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Ensure access is safe for workers and equipment<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"1\"><span style=\"font-weight: 400;\">Nominate workers to monitor the forms during placement<\/span><\/li>\n<\/ul>\n<h2><span class=\"ez-toc-section\" id=\"Build_Better_Walls_Through_Better_Preparation\"><\/span><b>Build Better Walls Through Better Preparation<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<p><span style=\"font-weight: 400;\">Most wall formwork problems begin before the concrete arrives. Accurate set-out, secure bracing, sealed joints, properly positioned reinforcement and a controlled pour reduce the risk of defects and delays.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Plan the system around the wall application, inspect each stage and address concerns before they become permanent. If your project needs a formwork approach suited to its structural and site requirements, speak with a specialist team before installation begins.<\/span><\/p>\n<h2><span class=\"ez-toc-section\" id=\"FAQs\"><\/span><b>FAQs<\/b><span class=\"ez-toc-section-end\"><\/span><\/h2>\n<h3><b>What is wall formwork?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Wall formwork is a temporary or stay-in-place system used to shape and support fresh concrete while it cures. It holds the concrete to the required wall dimensions and helps maintain alignment during placement. The system may include panels, ties, braces, supports, corners and sealing components. Correct installation is needed to prevent movement, leakage and surface defects.<\/span><\/p>\n<h3><b>What causes wall formwork to bulge?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Wall formwork may bulge when fresh concrete pressure exceeds the capacity of the panels, ties, braces or connections. Fast placement, weak supports, damaged components and incorrect tie spacing can all contribute. Prevent bulging by following the approved installation method, checking all braces before the pour and controlling the concrete placement rate. Monitor the wall continuously while concrete is being placed.<\/span><\/p>\n<h3><b>How can concrete leakage from wall formwork be prevented?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Concrete leakage can be prevented by inspecting and sealing joints, corners, penetrations and tie locations before the pour begins. Formwork faces should fit together securely, with no damaged edges or visible gaps. Check that all connections are properly tightened and that seals are compatible with the system. During placement, watch for slurry escaping and respond promptly if a leak appears.<\/span><\/p>\n<h3><b>Why is reinforcement cover important in wall formwork?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Reinforcement cover is the layer of concrete between steel reinforcement and the wall surface. It helps protect the reinforcement and supports the wall\u2019s intended durability. Poor cover can occur when bars move during installation or when spacers are missing. Check reinforcement placement before concrete is poured and use approved spacers or bar chairs to keep the steel in the correct position.<\/span><\/p>\n<h3><b>When should wall formwork be inspected?<\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Wall formwork should be inspected during installation, after reinforcement is placed and immediately before concrete placement. A final pre-pour inspection should check alignment, wall dimensions, bracing, ties, joints, penetrations and reinforcement cover. The formwork should also be monitored during the pour for movement, leakage or other changes. Early action can prevent defects that are harder to fix after curing.<\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Concrete walls can look straightforward on a drawing, yet site conditions can quickly reveal gaps in planning. A small set-out error, loose brace or poorly sealed joint can affect the wall\u2019s strength, finish and nearby work. Concrete wall forms shape and support fresh concrete while it gains strength. Correct installation requires careful preparation, clear responsibilities &#8230;<\/p>\n","protected":false},"author":14,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"default","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","footnotes":""},"categories":[2960],"tags":[],"class_list":["post-38817","post","type-post","status-publish","format-standard","hentry","category-services"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.linquip.com\/blog\/wp-json\/wp\/v2\/posts\/38817","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.linquip.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.linquip.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.linquip.com\/blog\/wp-json\/wp\/v2\/users\/14"}],"replies":[{"embeddable":true,"href":"https:\/\/www.linquip.com\/blog\/wp-json\/wp\/v2\/comments?post=38817"}],"version-history":[{"count":2,"href":"https:\/\/www.linquip.com\/blog\/wp-json\/wp\/v2\/posts\/38817\/revisions"}],"predecessor-version":[{"id":38819,"href":"https:\/\/www.linquip.com\/blog\/wp-json\/wp\/v2\/posts\/38817\/revisions\/38819"}],"wp:attachment":[{"href":"https:\/\/www.linquip.com\/blog\/wp-json\/wp\/v2\/media?parent=38817"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.linquip.com\/blog\/wp-json\/wp\/v2\/categories?post=38817"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.linquip.com\/blog\/wp-json\/wp\/v2\/tags?post=38817"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}