Combined cycle power plant 77MW -Rolls-Royce | Linquip

Combined cycle power plant 77MW

Evaluate this Device

ROLLS ROYCE 77 MW COMBINED CYCLE

• DLE Dry Low Emissions

• Cold start to full power in less than 10 minutes

  • ROLLS ROYCE 77 MW, 50 Hz COMBINED CYCLE

  • GAS TURBINE: RR TRENT 60 DLE

  • STEAM TURBINE SIEMENS 17.9 MW

  • HRSG AND SWITCHYARD

This device has been added to Linquip by:
★ Heberto Montiel Ríos