Field Engineer oil& gas at Emerson company

About:

Result-oriented Mechanical Piping Project and field Engineer with more than 18 years of experience in piping fabrication, installation, implementation, Detail Engineering, QA/QC, Procurement, Contracts, Negotiation, Testing & Commissioning, equipment installation, Offshore Interface works, Tie-in, Shut down (TA) and Start up works in Oil & Gas, marine, chemicals and other industrial Plant piping systems.

Expertise:

Skills:

Commissioning
Expertise
Field service
Greenfield development
Hydrostatic test
Process piping

Related Devices:

Kawasaki Heavy Industries
Kawasaki Heavy Industries
View Product

Projects:

Energy from waste paroject @ singapore

Piping Field Engineer/Inspector

Owner: Sembcorp ltd

31 Oct 2016 - 30 Aug 2017. 10 months

● Lead and supervise the team of 180-200 subcontractors for piping fabrication, installation, inspection and testing works. ● Carry out the piping Test pack Review, line walk inspection, Generate & Clear the Punch list, Hydro/Pneumatic Test, Flushing/Drying and Reinstatement inspections. ● To Lead and execute the pipe spool Welding Inspections, Tubing works, Painting, Insulation and Cladding works inspections. ● Monitoring the Pre-commissioning &Commissioning works and operational test for cooling water system, Fuel Gas/Oil (Boiler) Burner system, Hydraulic oil systems.

See Details

39

EXXONMOBIL Singapore Parallel Train (SPT) complex Project

Piping supervisor & coordinator

Owner: exxon mobil

31 May 2011 - 27 Feb 2013. over 1 year

● Supervise the Piping Fabrication, Installation, Inspection, Punch list Clearance, Hydro/Pneumatic Testing, flushing, Pre-Com/Commissioning, Reinstatement and final box up. ● Managing work execution carried out by piping contractors, ensuring the scope of work is achieved in accordance with contract requirements and timeframe. ● Lead and Supervise the Hot tapping, Tie-in works and installation of underground piping works. ● Lead and Supervise the Steam Tracing/Tubing, Painting &Insulation, Cladding works. ● Coordinate with customer and third party inspectors to lead and perform the inspections.

See Details

126

Pressure reducing skid projects (LNG &PNG SKID)

Field Engineer(mechanical/piping)

Owner: SEMBGAS & POWER GAS Singapore

31 Aug 2017 - 30 Dec 2019. over 2 years

● Lead and manage the Onsite and Offshore vessel pressure regulating skid and pipe spool fabrication and installation works with Emerson Brand Control Valves, Pressure regulators, perform the field inspection and Calibration test. ● Lead and supervise the LNG/PNG Pressure Regulating skid piping &equipment’s Fabrication, installation, testing & commissioning, painting, insulation & cladding works. ● To perform the site survey and prepare the materials and manpower cost for replacing the MPRS Skids, scheduling, fabrication and installation of the new MPRS skids with in timeframe. ● successfully lead a team of 50-55 subcontractors to manage the power gas and SembCorp gas plants PRV skids Turnaround projects ($500k-$1M)

See Details

47

SSF & BS Project @ SHELL SERAYA (Turnaround project)

Piping supervisor & coordinator

Owner: shell

31 May 2016 - 30 Oct 2017. over 1 year

● Possess the view of constructability and Progress on Civil, Structure, Piping, Mechanical/Electrical Equipment’s Installation and Instruments Installation Sequences. ● Scheduling and supervision to complete the Tie in (Hot/cold), Vessel Nozzle Enlargements work in sequential order as per Plant Operation Team &TA Team. ● Supervise the Structure & Mechanical Equipment’s Installation and Alignments. ● Lead and Supervision of Overall piping Fabrication, Installation, Inspection and Punch list Clearance, Hydro/Pneumatic Testing, Pre-commissioning, TFA, Reinstatements. ● Lead and Supervise the Steam Tracing/Tubing, Painting &Insulation, Cladding works

See Details

41

FPSO TOPSIDE MODULES PROJECT

Piping Field Engineer/Supervisor

Owner: SBM,MODEC,BP,EXXON,WOODSIDE

09 Mar 2008 - 27 Apr 2011. about 3 years

● Plan and Manage the Construction Execution Strategy in Day to Day activities. ● Conduct the Daily Tool box meeting, Prepare the Daily/weekly schedule and monitoring the Progress day by day, reporting to the Project Management. ● Lead and Supervise the team of 200-250 contractors for Overall Piping Fabrication, Installation, Inspection, Punch list Clearance, Hydro/Pneumatic Testing, Chemical Cleaning, Hot Oil Flushing, Pre-Com/Commissioning, Reinstatements. ● Monitoring the Scaffolding, blast & paint, heat Tracing, Insulation/cladding works. ● Lead & Supervise the fabrication and installation of onboard Piping Integration works on FPSO/FSO and Marine piping systems