Linquip Level: Advanced
Sind, Pakistan
Process Engineering Consultant at Fiver
Skills (Expertise):
Related Devices and Categories:
Projects:
Leader
Karachi, Sind, Pakistan
The main objective of this project is the design of sour water stripping section to remove Ammonia and Hydrogen Sulphide from Sour Water before processing in Industrial waste water Treatment Plant or reusing as wash water in existing process plants in the refinery. This report involves brief overview of the process, prevalent process schemes, material and energy balances, process simulation, design and operating conditions, flow sheeting, material selection, flash drum, feed tank and stripper sizing, tray and heat exchanger rating, hydraulic calculations and pump design, HAZOP study, instrumentation and control strategies, costing and optimization and environmental constraints. Sour Water is produced at several locations inside a refinery where water comes in contact with H2S and or NH3. If un-stripped water is exposed to open atmosphere, NH3 and H2S are released to environment, resulting in unpleasant smell and safety concerns, as a result of these toxic emissions banned can be implemented by national or international legislative authorities and environmental protection agencies.
Devices and Number:
Helix EXCEL
Centrifugal Pump
1 device
Light duty phase separator
Light duty phase separator
1 device
Liquid Distributor for Column Internals
Liquid Distributor for Column Internals
1 device
2P
hydraulic pump
1 device
Teammates:
Interests:
Compressor design
Heat transfer
Pump engineering
Mass Transfer
Simulation and modeling
Chemical synthesis and analysis
Chemical Process Engineering
Process engineer
Engineering Drawings
Petrochemical Process Design
Chemical engineer
Chemical Reaction