A dedicated person who wants to utilize the knowledge already gained in a responsible and proper manner, resulting in a value add to the organization and to progress professionally and personally.

Skills (Expertise):

Operation and maintenance

Projects:

[email protected] bar Twin steam boiler installation project

Project Engineer

Owner: RIGID Tyre corporation (Pvt.) Ltd.

06 Jun 2019 - 24 Oct 2019. 5 months

Horana, Kalatura, Sri Lanka

Design and install fully automated biomass steam boiler unit at factory premises to generate saturated steam for tyre manufacturing and other utilities.

Fuel Handling system design and installation

Project Engineer

Owner: RIGID Tyre corporation (Pvt.) Ltd.

04 Aug 2019 - 24 Oct 2019. 3 months

Horana, Kalatura, Sri Lanka

Design, Fabricate and install fully automated fuel handling system for a Biomass boiler unit.

Design a Wood chipping plant

Project Engineer

Owner: RIGID Tyre corporation (Pvt.) Ltd.

02 Sep 2019 - 15 Oct 2019. about 1 month

Horana, Kalatura, Sri Lanka

Design a wood chipping plant in-house to prepare wood chips for biomass boiler operation. 5-8 TPH drum type 2 Nos. of wood chippers install with conveyors.

design /fabricate and install Steam distribution line

Project Engineer

Owner: RIGID Tyre corporation (Pvt.) Ltd.

22 Apr 2019 - 16 Oct 2019. 6 months

Horana, Kalatura, Sri Lanka

Design steam distribution lines all over the factory with required steam traps and below. Then fabricate and install the line with necessary accessories.

Design /Fabricate and Install Steel Chimney for Bio-mass Boiler

Project Engineer

Owner: RIGID Tyre corporation (Pvt.) Ltd.

22 Jul 2019 - 06 Oct 2019. 3 months

Horana, Kalatura, Sri Lanka

Design and fabricate 30m height steel chimney for the 3TPH Twin bio-mass boiler.

VAM Chiller Installation

Trainee Project Engineer

Owner: Blue Water Hotel-Wadduwa

05 Nov 2018 - 19 Dec 2018. about 1 month

Kalutara, Kalatura, Sri Lanka

Install and commission VAM chiller system with the distribution system.

12TON Fully automated boiler installation

Trainee Project Engineer

Owner: Trellabog lanka Pvt. Ltd

25 Nov 2019 - 02 Mar 2020. 3 months

Colombo, Colombo, Sri Lanka

Installed fully automated 12TPH biomass boiler at Trelleborg Lanka Pvt ltd to generate saturated steam for the tyre manufacturing process.

Kiln shell replacement project

Trainee Project Engineer

Owner: Insee cement plant-Puttalm

14 May 2018 - 30 Jul 2018. 3 months

Puttalama, Puttalama, Sri Lanka

The damaged part of the kiln shell was replaced with a new one.

Interests:

Air compressors

High temperature hot water

Steam boiler

Utility operations

AC