Sahan Pradeepa Jayasekara profile | Linquip

Sahan Pradeepa Jayasekara

Nuwara Eliya, Sri Lanka

Engineering Executive-Mechanical at FERENTINO Tyre Corporation Pvt. Ltd

Status: Open to work

Bachelor of Engineering in Mechanical Engineering

Viewers: 69Followers: 20Followings: 5

About:

A dedicated person who wants to utilize the knowledge already gained in a responsible and proper manner, resulting in a value add to the organization and to progress professionally and personally.

Industries:

Bio-Fuel

Compressor

Heat Exchanger

Pump

Environmental, Health and Safety

Level Control Systems

Pressure Transducers

Welding and Soldering Machines

Temperature Sensors and Thermostats

Flowmeter

PLC

Electrical

Tanks and reservoirs

Expertise:

Skills:

AC
Air compressors
High temperature hot water
Hydro power plants
Operation and maintenance
Project management
Steam boiler
Steam power plants
Utility operations

Projects:

Project Engineer

Owner: FERENTINO Tyre corporation (Pvt.) Ltd.

06 Jun 2019 - 24 Oct 2019. 5 months

Design and install fully automated biomass steam boiler unit at factory premises to generate saturated steam for tyre manufacturing and other utilities.

See Details
1

46

Project Engineer

Owner: FERENTINO Tyre corporation (Pvt.) Ltd.

04 Aug 2019 - 24 Oct 2019. 3 months

Design, Fabricate and install fully automated fuel handling system for a Biomass boiler unit.

See Details
1

46

Project Engineer

Owner: FERENTINO Tyre corporation (Pvt.) Ltd.

02 Sep 2019 - 15 Oct 2019. about 1 month

Design a wood chipping plant in-house to prepare wood chips for biomass boiler operation. 5-8 TPH drum type 2 Nos. of wood chippers install with conveyors.

See Details
1

46

Project Engineer

Owner: FERENTINO Tyre corporation (Pvt.) Ltd.

22 Apr 2019 - 16 Oct 2019. 6 months

Design steam distribution lines all over the factory with required steam traps and below. Then fabricate and install the line with necessary accessories.

See Details
1

46

Project Engineer

Owner: FERENTINO Tyre corporation (Pvt.) Ltd.

22 Jul 2019 - 06 Oct 2019. 3 months

Design and fabricate 30m height steel chimney for the 3TPH Twin bio-mass boiler.

See Details
1

45

Trainee Project Engineer

Owner: Blue Water Hotel-Wadduwa

05 Nov 2018 - 19 Dec 2018. about 1 month

Install and commission VAM chiller system with the distribution system.

See Details
1

48

Trainee Project Engineer

Owner: Trellabog lanka Pvt. Ltd

25 Nov 2019 - 02 Mar 2020. 3 months

Installed fully automated 12TPH biomass boiler at Trelleborg Lanka Pvt ltd to generate saturated steam for the tyre manufacturing process.

See Details
1

45

Trainee Project Engineer

Owner: Insee cement plant-Puttalm

14 May 2018 - 30 Jul 2018. 3 months

The damaged part of the kiln shell was replaced with a new one.