Search
Companies

Ignacio Martin

Linquip Level: Expert

Cordoba, Argentina

Wind Services Business Development at Independent Consultant

Status: Open to work

Engineering

About:

Project Manager with 10 years of experience working for engineering and manufacturing plants, performing the development and management of medium and huge projects. I have knowledge on team leading and building, BIM and SCRUM methodology application and ability to work at different environments under pressure and achieve high objetives.

My professional skills were performed accrossing different types of industries, companies profiles and cultures working more than 4 years for foreign market, traveling mainly to asian and european countries.


Skills (Expertise):

Condition Monitoring

Related Devices and Categories:

Test

Related Devices and Categories:

Consulting

Problem Solving

Related Devices and Categories:

Asset Management

Related Devices and Categories:

Vibration Analysis

Endoscopy

Related Devices and Categories:

Quality Control (qc)

Related Devices and Categories:

Expertise

Related Devices and Categories:

Projects:

La Esperanza (Wind Farm)

Inspection and Certification Lider

Owner: Envision Energy Chile

12 Aug 2019 - 27 Nov 2020. over 1 year

Bio Bio, Bio Bio, Chile

5 WGT - ENVISION 2.1 MW Periodic inspection of components & preventive maintenance inspection: - Ladders - Service Lift - Life Line - Top nacelle crane - Anchor Points - Decensor device

Garcia del Rio (Wind Farm)

Inspection and Certification Lider

Owner: Envision Energy

03 Feb 2020 - 27 Nov 2020. 10 months

Buenos Aires, Buenos Aires, Argentina

4 WGT - ENVISIO 2.3 MW Periodic inspection of components & preventive maintenance inspection: - Ladders - Service Lift - Life Line - Top nacelle crane - Anchor Points - Decensor device

Vientos los Hercules (Wind Farm)

Inspection and Certification Lider

Owner: Total & Eren Renewables

06 Jan 2020 - 27 Nov 2020. 11 months

Santa Cruz, Santa Cruz, Argentina

27 WGT - SENVION 3.2 MW Periodic inspection of components & preventive maintenance inspection: - Ladders - Service Lift - Life Line - Top nacelle crane - Anchor Points - Decensor device

Devices and Number:

Kosten (Wind Farm)

Inspection and Certification Lider

Owner: Grenergy

25 Jan 2020 - 27 Nov 2020. 10 months

Comodoro Rivadavia, Chubut, Argentina

7 WGT - SENVION 3.2 MW Periodic inspection of components & preventive maintenance inspection: - Ladders - Service Lift - Life Line - Top nacelle crane - Anchor Points - Decensor device

Devices and Number:

Loma Blanca VI (Wind Farm)

On site - Auditor

Owner: Goldwind

11 Nov 2019 - 27 Nov 2020. about 1 year

Trelew, Chubut, Argentina

32 WGT - GOLDWIND 3.2 MW Walk down auditory - Visual inspection. Project quality assessment on site.

Devices and Number:

Pampa de Malaspina (Wind Farm)

Inspection and Certification Lider

Owner: Total & Eren Renewables

14 May 2020 - 27 Nov 2020. 7 months

Puerto Madryn, Chubut, Argentina

14 WGT SENVION 3.6 M114 Periodic inspection of components & preventive maintenance inspection: - Ladders - Service Lift - Life Line - Top nacelle crane - Anchor Points - Decensor device

Devices and Number:

La Castellana (Wind Farm)

Inspection Project Manager - Site Engineer

Owner: Central Puerto Renovables

10 Jul 2020 - 27 Nov 2020. 5 months

Buenos Aires, Buenos Aires, Argentina

32 WGT - AW125/3200 Acciona - Gbox MOVENTAS PPLH 2900 End of Warranty Inspection: - Gearbox full endoscopy inspection: Olympus G-Lite boroscope application. - Gearbox Oil analysis: Spectrometry. - Main shaft bearings Grease analysis: Spectrometry and root case analysis. - Blade bearings Grease analysis: Spectrometry analysis. - Drive train / power train vibration analysis: 8 points measurement and vibration evaluation (parallel to CMS) - SCADA data analysis: (Theorical power curve vs real power curve) - Eficiency study - Availability study - WSM analysis - CMS evaluation. - Visual inspection: General overview.

Devices and Number:

Achiras I (Wind Farm)

Inspection Project Manager - Site Engineer

Owner: Central Puerto Renovables

10 Jul 2020 - 27 Nov 2020. 5 months

Rio Cuarto, Cordoba, Argentina

15 WGT - AW125/3200 Acciona - Gbox MOVENTAS PPLH 2900 End of Warranty Inspection: - Gearbox full endoscopy inspection: Olympus G-Lite boroscope application. - Gearbox Oil analysis: Spectrometry. - Main shaft bearings Grease analysis: Spectrometry and root case analysis. - Blade bearings Grease analysis: Spectrometry analysis. - Drive train / power train vibration analysis: 8 points measurement and vibration evaluation (parallel to CMS) - SCADA data analysis: (Theorical power curve vs real power curve) - Eficiency study - Availability study - WSM analysis - CMS evaluation. - Visual inspection: General overview.

Devices and Number:

Media:

Gearbox endoscopy - 1st Planetary stage inspection.
LA CASTELLANA Wind Farm - End of Warranty inspection.
PAMPA DE MALASPINA WIND FARM (Service Lift Max Load Test *Dinamometer*)
VIENTOS LOS HERCULES WIND FARM (Crane max load test, 0,5 Ton - At ground level *safety first* - ASME B30.11)
LOMA BLANCA WIND FARM. Walk Down Auditory - Goldwind turbine.
LOMA BLANCA WIND FARM (Checking the grease application on screws, before rotor and blades installation) Supervision from nacelle.

Interests:

Wind turbine

Business development

Project manage

Project managment

Wind turbine technology

Scrum

Non destructive test

New companies on Linquip:
loading...
New projects on Linquip:
loading...