About:

Experienced Maintenance with a demonstrated history of working in the oil & energy industry (over 60 SIEMENS Gas Turbines). Skilled in gas turbine installation, commissioning, and overhaul (over 40 SIEMENS Gas Turbines). Skilled in balancing. Experienced in video scope. Skilled in REVIT, AutoCAD, Gas, Petroleum, Energy, and Power Plants. Familiar with THERMOFLEX, Strong operations professional with a Bachelor's degree focused in fluid mechanics from jondishapoor University of Ahwaz.

Familiar with renewable energies. graduated MSc. of Energy Engineering. Performing Solar Distillation Plant MED optimisation as Final Thesis.

Skills (Expertise):

gearbox overhaul

Related Devices and Categories:

Gas turbine generator

Related Devices and Categories:

Projects:

Arak Refinery Siemens SGT700 Gas Turbo Generator Overhaul - Level C

Project Manager, Mechanical Supervisor

Owner: Arak Refinery IKORC

17 Jan 2020 - 09 Nov 2020. 10 months

Arak, Markazi, Iran

40000 hours service for Siemens SGT700 Turbo-Generator includes: replacing CT1 and CT2 blades and vanes, Combustion Chamber. In addition, because of unacceptable condition of Turbine and compressor bearings, they all replaced by new ones. All dis-assembled parts were inspected too for probable damage. According to our team hard work and precise inspection, the Turbo-Generator has been working perfectly.

Devices and Number:

Abpakhsh Booster Station

Project Manager, Mechanical Supervisor, Commissioning Supervisor

Owner: National Iranian Gas Company

30 Apr 2019 - 17 Nov 2019. 7 months

Borazjan, Bushehr, Iran

In this project, the last SIEMENS SGT-600 Gas Turbo Compressor of 4 units station started to export after commissioning by Hamkar Sanat Behsaz Co. The Turbine was abandoned for several years until it was commissioned by the team of HSB Co experts in 2019. Some devices, Parts, and components were broken. They were fixed or replaced to perform the project well. All previous works had to be checked again before start.

Nikpey Booster Station FOD Overhaul

Workshop Manager

Owner: National Iranian Gas Company

04 Feb 2019 - 05 Aug 2019. 6 months

Tehran, Tehran, Iran

Dismantling, Cleaning, Inspection of FOD SGT-600 Gas Turbine belongs to NIGC to find the cause of damages and then fixing/replacing scrapped parts and assembling the engine to deliver to its origin site. The cause of FOD was stage#1 compressor blade fail. The whole maintenance was done in DMC workshop.

Siemens SGT600 Hot Section refurbishment

Project Manager

Owner: National Iranian Gas Company

04 Jun 2020 - currently working. 8 months

Tehran, Tehran, Iran

In this project, we must identify, inspect, remove coatings, repair defection, re-coat, final check and hand over 2 sets of CT vane#1 , 2 sets of CT vane#2 , 2 Stator rings, and 2 combustion chambers of SIEMENS SGT600 Industrial Gas Turbine.

Media:

Interests:

Gas turbine engineer

Gas turbine maintenance supervisor

Rotary project manager

Balancing expert

Gas turbine auxiliary inspector

New companies on Linquip:
loading...
New projects on Linquip:
loading...